From historical certificates to quality control
Understand historical metrology records, current product documentation and the manufacturing controls behind measurement quality.
D
DADI Technical Team
Quality & Manufacturing
Related factory image: DADI encoder component inspection.
SUMMARY
Historical metrology documents describe a specific approval or licensing scope at a particular time. Assess an instrument supplied today using the requirements applicable to that model, the original approval records, and its current inspection and calibration evidence.
On this page
Understanding China's former measuring-instrument manufacturing licenses, product type approval, and the factory inspection practices used for surveying instruments today.
Technical basis: Official Chinese metrology regulations; DADI's company-reported historical documentation and factory inspection practices, including its electronic-theodolite calibration procedures.
Reviewed: November 2026
China discontinued the former Manufacturing License for Measuring Instruments requirement effective December 28, 2017. This did not eliminate all type-approval requirements: the 2020 catalogue still lists total stations as instruments subject to type approval. Ordinary electronic theodolites are not separately named in that catalogue, but the legal classification of an individual product depends on its actual functions and the applicable rules. For DADI, archived certificates can document historical regulatory activities within their stated scope. The quality of an instrument supplied today must be evaluated using the rules applicable to that product, its manufacturing controls, inspection results, and relevant records.
Key Facts
- Former Manufacturing License
- Discontinued in 2017
- Total Stations
- Type Approval Still Listed
- Electronic Theodolites
- Not a Separate 2020 Entry
- Historical Certificate
- Scope Must Be Checked
- DADI 2C Inspection
- ±10″ Acceptance / ±5″ Target
- Pre-Shipment Process
- Three Inspection Stages
When a customer asks a surveying-instrument manufacturer for a certificate, an important follow-up question is: what exactly does that certificate demonstrate? A document issued for a particular product type, a former manufacturing license, a factory inspection report, and a calibration certificate do not establish the same facts.
Changzhou DADI Surveying Science & Technology Co., Ltd. traces its manufacturing history to 1991. DADI has described historical measuring-instrument qualifications in its company materials. This article explains the regulatory context of those records and sets out practical ways to assess the measurement quality of a product manufactured today.
1. What Did the Two Historical Approval Systems Examine?
Under China's former regulatory framework, certain measuring-instrument manufacturers encountered two different forms of administrative control: approval of a measuring-instrument type and licensing of the manufacturing organization. Their purposes were distinct.
Product Type Approval (CPA)
A Certificate of Pattern Approval (CPA) concerns a specified measuring-instrument type. Type evaluation assesses sample instruments and supporting technical information against applicable legal and metrological requirements. The certificate and its accompanying records identify the scope of the approval, including the product designation and relevant model information.
The existence of one CPA document does not establish that every other model, substantially modified design, or later instrument made by the same company is covered.
Former Manufacturing License
The former Manufacturing License for Measuring Instruments related to the conditions under which a producer manufactured measuring instruments. Historical licensing rules addressed matters such as facilities, personnel, inspection equipment and quality-management arrangements. This licensing system was later discontinued.
Product type approval asks: Has the defined instrument type undergone the required regulatory evaluation?
The former manufacturing license asked: Did the manufacturer meet the production-related requirements of the licensing framework at that time?
Neither document substitutes for examining the actual instrument and its current inspection records before delivery.
2. How Did China's Metrology Requirements Change?
| Date | Regulatory Development and Meaning |
|---|---|
| December 28, 2017 | The former manufacturing and repair licensing system was abolished. Authorities stopped accepting applications for those licenses. |
| October 26, 2020 | SAMR Announcement No. 42 published the revised Catalogue of Measuring Instruments Subject to Mandatory Management. Total stations, handheld laser distance meters and geodetic GNSS receivers were listed under the surveying-instrument category for type approval. |
| June 1, 2023 | The revised Measures for the Management of New Products of Measuring Instruments (SAMR Order No. 68) took effect. They set out type-approval requirements for new measuring-instrument products covered by the catalogue and rules concerning approved-type consistency and significant product changes. |
The regulatory conclusion needs to be precise: abolishing the former manufacturing license did not abolish all product type approval. The 2020 catalogue continues to identify total stations for type approval. Ordinary electronic theodolites do not appear as a separately named item in that catalogue; nevertheless, the classification of an individual instrument must follow its actual functions and the applicable rules rather than its marketing name alone.
Under the 2023 measures, significant changes to an approved product's structure, materials, or key components that change its performance or technical characteristics can require a new type-approval application. The scope of an older certificate and the status of a later model must therefore be assessed from the relevant official documents, not inferred from a shared manufacturer name.
Type Approval Is Not the Same as Compulsory Verification
The same 2020 catalogue distinguishes type approval from compulsory verification during use. The total-station entry specifies type approval, without separately listing compulsory verification for that entry. It would therefore be incorrect to claim that the catalogue requires every total station to undergo periodic compulsory verification merely because the instrument is subject to type approval.
Factory inspection, calibration, statutory verification and type approval address different questions. The correct requirement depends on the instrument category, its use and the relevant technical and legal provisions.
3. What Can DADI's Historical Certificates Establish?
DADI's company materials refer to historical metrology and manufacturing-approval records. These documents are part of the company's reported development history. Their evidentiary value comes from the precise information recorded on each original document, including its holder, issuing authority, date, instrument category and approved or licensed scope.
A historical manufacturing license should be presented as a record of the former licensing regime, not as a manufacturing permit still required under that discontinued system. An older CPA document should likewise be described according to its actual scope; its issue date alone neither proves that it is invalid nor that it covers all models currently supplied by the manufacturer.
For a particular purchase or compliance review, the relevant certificate and any model annexes should be checked directly. A manufacturer's historical experience may explain its approach to measurement and quality, but a specific product's present regulatory status cannot be established from company history alone.
4. How Does DADI Apply Measurement Controls in Production?
DADI's factory-described inspection process provides examples of how a technical requirement can be translated into a measurement procedure and an acceptance decision. The examples below relate primarily to relevant electronic-theodolite models. They are manufacturer-reported factory practices, not third-party certification of every instrument model.
Mechanical and Optical Alignment
A working angle display does not, on its own, prove correct telescope alignment or mechanical-axis geometry. For applicable instruments, DADI inspects mechanical and optical conditions and adjusts relevant geometry before conducting finished-instrument angular accuracy verification. This separates component and alignment checks from the performance of the complete assembled instrument.
A Concrete Example: 2C Collimation Error
In DADI's confirmed inspection method, the technician sights the target in a horizontal collimator in Face I and sets the ordinary horizontal-circle reading to 0°. The instrument is changed to Face II and the same target is sighted again. The nominal 180° difference between the two circle positions is accounted for when calculating the 2C result.
2C = L − (R ± 180°)
L = Face I horizontal reading; R = Face II horizontal reading. Select the 180° adjustment to match the readings and normalize the signed result.
- DADI Factory Acceptance
- ±10″
- DADI Internal Control Target
- ±5″
These two limits apply to the measured 2C error itself. They are not defined as tolerances for the difference between repeated 2C readings, nor are they the same thing as the instrument's rated angular accuracy. The numerical criteria are DADI factory criteria for the applicable inspection procedure and should not be presented as universal national limits for every theodolite.
Angular Accuracy Testing
For relevant 2″ electronic-theodolite models, DADI describes using a precision multi-tooth indexing table, repeated Face I and Face II observations, and dedicated evaluation software to assess horizontal angular accuracy at 12 positions. This evaluates the assembled instrument over a series of angular reference positions, rather than relying on a single reading.
Three Inspections Before Shipment
DADI describes a three-stage inspection workflow for its relevant surveying instruments: an initial qualified inspection after production, a check during shipment preparation and a final check on the day of dispatch. Later measurements are compared with the recorded initial inspection condition. A result outside an applicable acceptance limit calls for further investigation and necessary adjustment or recalibration before release.
These practices illustrate a quality-control method: establish criteria, measure, record, compare and act when needed. They do not imply that all measurement errors can be eliminated or that all models have identical inspection requirements.
5. Which Documents Should a Buyer Request?
The most useful document depends on the question the buyer needs answered.
| Document | What It Helps Establish | Important Limit |
|---|---|---|
| Historical manufacturing license | Historical licensing participation within its documented scope | Not a permit currently issued under the abolished licensing scheme |
| Certificate of Pattern Approval | Approval of the specified instrument type and named model scope | Does not automatically cover different or materially changed models |
| Factory inspection report | Identified inspection steps, recorded results and factory acceptance decision | Not automatically a third-party calibration or statutory verification certificate |
| Calibration / verification certificate | The measurements, conformity statement or traceability information shown on that certificate | Check issuing body, method, scope, date and instrument identification |
For any particular order, customers should confirm in advance whether factory inspection records, independent calibration, statutory verification, or other documentation is required. Document availability and applicability may differ by model, destination and order requirements.
6. Industry Observation: The Importance of Clear Acceptance Criteria
Surveying instruments are manufactured by companies with different histories, sizes, production structures and technical specializations. Neither company age nor workforce size alone proves that an instrument is accurate or that its production controls are adequate.
A meaningful supplier comparison asks more concrete questions: What performance specification applies? Which test method is used? What result constitutes acceptance? How is the reference equipment maintained? Can the supplier identify the instrument tested and provide the corresponding record?
Experience under former metrology regulations may have shaped the way a manufacturer organizes its technical records. A newer manufacturer can establish equally rigorous procedures, and a long-established manufacturer must still demonstrate present-day conformity. The relevant distinction is the quality and clarity of the evidence available for the product being supplied.
7. A Practical Review Checklist for Buyers
Confirm the exact legal manufacturer, instrument type, model and configuration.
Identify the regulations, standards and customer acceptance criteria applicable to that model and intended market.
Where type approval is applicable, examine the certificate and model scope rather than relying on a general company statement.
Ask how angle accuracy, distance accuracy or relevant specialized functions are checked.
Review whether test records identify the instrument, date, equipment or method, result and acceptance criterion.
Distinguish factory reports from independent calibration certificates and statutory verification documents.
Agree on any additional tests or documentation before order confirmation.
Frequently Asked Questions
Was China's manufacturing license for measuring instruments abolished?
Yes. The former manufacturing and repair licensing requirement was removed effective December 28, 2017. This change did not remove the manufacturer's continuing responsibilities for measurement quality and other applicable regulatory requirements.
Did the 2020 reform remove type approval for total stations?
No. Total stations remained listed for type approval in the 2020 catalogue. The legal status of any particular model and its approved configuration must be established from the applicable rules and relevant approval documents.
Does an ordinary electronic theodolite need the same approval as a total station?
An ordinary electronic theodolite is not separately named in the 2020 catalogue. That observation does not automatically classify every specialized or combined-function instrument; the actual product characteristics and current applicable rules must be considered.
Does an older CPA certificate automatically cover a newer model?
No. The exact model scope and any approved changes must be checked. Under the 2023 measures, significant modifications that change performance or technical characteristics can require a new approval application.
Is type approval the same as compulsory verification?
No. Type approval concerns a measuring-instrument type; compulsory verification concerns specified instruments and uses under the applicable rules. The 2020 catalogue lists total stations for type approval, not automatically for periodic compulsory verification during use.
Does a factory report prove third-party calibration?
No. A factory report records what the manufacturer inspected. An independent calibration certificate has a separately identifiable issuer, method and scope. A statutory verification certificate has its own legal purpose and should not be described as interchangeable with either document.
How does DADI demonstrate its current inspection approach?
DADI describes model-appropriate optical, mechanical and angular checks, including defined 2C acceptance criteria for applicable electronic theodolites, angular testing at multiple reference positions and repeated inspections before shipment. Individual records are the relevant evidence of what was actually tested on a particular delivered unit.
Related DADI Technical Resources
For the manufacturer's detailed inspection workflow, see How Is an Electronic Theodolite Calibrated and Inspected Before Shipment?
For an example of a specific geometric acceptance criterion, see What Is Collimation Error (2C Error) in an Electronic Theodolite?
For an account of mechanical-axis inspection, see Inside DADI Factory: Horizontal and Vertical Axis Inspection.
Conclusion
Historical certificates and official approval records are useful when their identities and scopes are presented accurately. They document specific regulatory processes at particular points in time. They should not be used to make wider claims about models or approvals that the documents do not cover.
For DADI, the practical continuity between historical metrology experience and current production lies in defined specifications, appropriate calibration and inspection procedures, recorded results and clear acceptance decisions. Those are the elements customers can review when evaluating the quality of an instrument supplied today.
About Historical Certificate Evidence
If archival certificates are displayed with this article, they should be identified by the original holder, issuing authority, number, covered model, issue date and relevant annexes. Historical manufacturing-license documents are evidence of the former system and are not currently issued manufacturing permits. Any statement concerning present type-approval coverage must be supported by the particular approval documents and applicable rules.
Official Regulatory References
Former AQSIQ Announcement No. 2 (2018): Abolition of Manufacturing and Repair Measuring-Instrument Licenses — applications discontinued from December 28, 2017.
SAMR Announcement No. 42 (2020): Catalogue Revision — dated October 26, 2020.
Official Catalogue of Measuring Instruments Subject to Mandatory Management (PDF) — see the surveying-instrument entries on page 5.
SAMR Order No. 68: Measures for the Management of New Products of Measuring Instruments — effective June 1, 2023.
Regulatory descriptions are based on the official documents cited above. Product-specific compliance questions must be assessed against the applicable requirements and the relevant original approval records. DADI factory-process descriptions are based on company technical information and should be corroborated by individual inspection records when used for a specific procurement decision.
Discuss your measurement requirements.
Contact DADI for instrument selection, technical documents or a specialized application.